Waterstar logo — swimming pool equipment manufacturer in Egypt

How to Open Your Swimming Pool After Winter — Step by Step Guide

## Step 1: Remove and Clean the Pool Cover Carefully remove the pool cover, taking care not to let debris fall into the water. Clean the cover with a mild cleaner, allow it to dry completely, then fold and store it away from sunlight. ## Step 2: Remove Winter Plugs and Reinstall Equipment If you winterized the pool by draining the plumbing, remove winter plugs now. Reinstall drain plugs on the pump and filter. Reconnect all hoses and fittings. ## Step 3: Refill the Pool Fill the pool to its normal operating level — typically at the midpoint of the skimmer opening. ## Step 4: Start the Pump and Filter System Prime the pump if needed. Run the pump and check for leaks at all connections. Allow the system to run for at least 12 hours before testing chemistry. ## Step 5: Test and Balance Water Chemistry - pH: Adjust to 7.2–7.6 - Alkalinity: Target 80–120 ppm - Calcium Hardness: Target 200–400 ppm - Free Chlorine: Shock the pool to 5–10 ppm on opening ## Step 6: Brush and Vacuum Brush all pool surfaces — walls, floor, and steps — to loosen any winter algae. Vacuum to waste to remove debris. ## Step 7: Check All Equipment - Inspect pump and filter for cracks, leaks, or worn seals - Test all underwater lights - Check skimmer baskets and weir doors - Inspect ladders and handrails for corrosion ## Waterstar Tip In Egypt, the pool opening season typically starts in March–April. Plan on 24–48 hours of continuous pump operation after treatment before the water clears completely. Do not swim until free chlorine is below 5 ppm.